TB Christmas Fun!

What a great time we all had last week at our Christmas party!

We visited the National Justice Museum in the Lace Market in Nottingham and took part in a 1930’s murder mystery! We explored this Grade II* listed building, housing a Victorian courtroom and basement gaol cells, quizzing the suspects in order to make our deductions.

Over a delicious dinner in the grand entrance hall, we gathered further evidence and made our accusations. After a little bit of competitive rivalry, both teams were correct in naming the suspect, and our very own resident Miss Marple, Bethan, was so exemplary in her evidence gathering and recording that she won the champagne prize! Highly deserved.

We revelled into the night at the Pitcher and Piano, where there were some highly entertaining cocktail makers, and we all made it down to breakfast the following morning in the lovely Lace Market Hotel where we were staying.

We love to treat our team and their partners at this time of year. It’s so great for us to get together, and have fun and laughs away from the office. Our secret Santa gift exchange is always a real highlight, usually for the wrong reasons, and this year was no different!

Thanks team for another great year, and a Merry Christmas to you all from us!

Contemporary Extension Planning Application Submitted

We’re delighted to have submitted a planning application in the beautiful Derbyshire Dales for a new contemporary extension. The extension will be to the rear of a cottage within a Conservation Area.

The existing cottage is very linear, with rooms front and back of the house. The new extension will widen the footprint to the rear of the house, allowing for an additional bedroom and new living space flooded with light to allow views over the Derbyshire Dales.

If you live in a Conservation Area, planning rules are stricter to help protect its historic and architectural character. This means you’ll often need permission for extensions, demolitions, replacing windows or roofs, and even for works to trees. Councils may also restrict minor changes through Article 4 Directions, so it’s always best to check with your local planning authority before carrying out any work.

Delays With Planning Applications

One thing we are constantly faced with is delays in the planning application system. This can be for multiple reasons.  It is always frustrating, but can risk timescales and increase costs.

This can strain relationships with clients as they can often feel we have more control over the process than we actually do.

It’s very common for a planning officer to ask for an extension of time on a planning application. Should you agree or not?

It’s not as easy as it sounds.

If you don’t agree to an extension of time on a planning application, the local planning authority (LPA) is legally required to make a decision within the original statutory time limit. This is usually:

  • 8 weeks for most minor applications
  • 13 weeks for major applications
  • 16 weeks if an Environmental Impact Assessment (EIA) is required

Here’s what happens in practice if you refuse or withdraw your agreement to extend time:

1. The LPA must decide “as is”

The council must either approve or refuse the application based on the information currently available.

If the case officer hasn’t yet completed consultations, received key reports, or resolved issues, they’ll often refuse the application to meet the statutory deadline.

This is often done using a standard reason such as “Insufficient information has been provided to assess the proposal against relevant planning policies.”

2. The “deemed refusal” right to appeal

If the LPA fails to issue a decision in time and no extension of time has been agreed, you (the applicant) gain the right to appeal to the Planning Inspectorate for non-determination (under Section 78 of the Town and Country Planning Act 1990).

However:

  • This can take several months,
  • It usually requires paying appeal fees and providing updated documents,
  • The Inspectorate will assess the application as if it were being determined anew, including all the same policies and material considerations.

3. Relationship with the LPA

Refusing an extension can strain relations with the planning officer. Councils often ask for extensions to allow:

  • Completion of consultee responses,
  • Negotiation of amendments or conditions, or
  • Committee scheduling.

If you decline, they may be less inclined to negotiate or support minor revisions later.

4. Strategic considerations

It’s sometimes reasonable not to agree to an extension — for example:

  • If the council has unreasonably delayed the process,
  • If you want to trigger an appeal to get an independent decision, or
  • If the delay would affect your funding, contracts, or programme.

But in most cases, agreeing a short extension (a week or two) allows the officer to resolve issues and potentially approve the application without the cost or risk of an appeal.

An applicant needs to consider all the factors carefully. You should always seek advise before making any decision.

Preliminary Paragraph 84 Design

Whilst it’s only early stages and preliminary thoughts, it’s great to share this exciting sketch of a partly earth sheltered Paragraph 84 house design that we have been involved with recently. Thinking Buildings has worked on a few of these aspirational projects over the years, working within the Paragraph 84 clause of the UK’s National Planning Policy Framework (NPPF), that sets out various circumstances which can enable the erection of new isolated dwellings in the open countryside. The key driver behind these policies is to deliver highly sustainable houses of exceptional quality and this sets a very high bar for both client and architects, demanding a design approach of the highest quality.

We hope that we will have more positive news to share about this project in the future.

Improvements at Granville Academy for Affinity Learning Partnership

Thinking Buildings continues to enjoy a strong working relationship with the Affinity Learning Partnership, formerly The de Ferrers Trust, supporting them with improvements across their schools. At Granville Academy in Woodville, Swadlincote, we are pleased to confirm that the playground, toilets and office projects have now reached the end of their defects period.

Working alongside Davlyn Construction, SA Consulting and Approved Inspectors Building Control, the project has delivered a significant transformation to the academy’s main external social space. Achieved through very simple and cost-effective design solutions, the works included new ramps, steps and resurfacing. These improvements not only make student movement across the sloping site easier and more accessible, but also encourage socialising and even create potential for external teaching spaces.

Internally, the project provided new office space and refurbished toilets, both of which will help deliver a more comfortable and practical environment for staff and students. These changes reflect the Partnership’s continued commitment to investing in facilities that positively support learning and wellbeing across their schools.

This has been another positive project with Affinity Learning Partnership, and it has been great to see the benefits now being enjoyed by the school community.

Planning Submitted for Meadow House

We are delighted to share that proposals for this stunning property have now been submitted for planning. Working alongside Edgars, the scheme is an exciting transformation of a 1960s house that has seen a number of less sympathetic additions over the years. Our clients have been ambitious for design excellence and this project sets out to deliver just that.

The works include a new 1.5 storey side extension to provide improved accommodation and a replacement double garage. Internally, the existing garage will be converted into a guest bedroom, while the roof adjustments allow for more generous space on the upper floors. Externally, a new oak framed porch provides a welcoming entrance, with oak posts and framing to the garage giving rhythm and architectural depth to the front façade.

A major focus of the proposals is recladding the unsympathetic artificial stone with high quality natural limestone, together with oak cladding and render. This will bring warmth, coherence, and a connection to the conservation area context. At the rear, reconfigured balconies, timber cladding, and improved fenestration simplify and soften the appearance while opening the home to the garden and views beyond.

For sustainability we have specified upgraded heating systems, and the sensitive use of local materials, so the scheme looks to respect heritage while delivering a family home full of character and quality.

If you have a similar property that would benefit from a fresh design approach or are considering extensions and recladding works of your own, do get in touch. We would be delighted to explore how we can help transform your home into something that is both practical and beautiful.

North Oxfordshire Farmhouse Renovation

This week, we are pleased to share with you, this scheme for an extensive renovation of a country home that has been granted planning permission.

Thinking Buildings have been working with a private client to develop this impressive property into a modern family home. The scheme removes a modern conservatory and replaces it with a new side extension, along with adding a first floor to an existing rear extension and reconfiguring the west face of the property to improve the house’s circulation and entrance. Altogether this creates an additional two bedrooms, and provides a new open plan kitchen and living space, providing much more suitable accommodation for a property of this size.

The client had great patience through a challenging planning process, with complex policy, heritage, and ecology issues. Despite this, we were able to maintain the overall drivers of the main house design, and provide the client with a positive outcome.

The architectural scheme has been supported by landscape design by Nicholsons, which elevated the setting of the house further.

We are looking forward to helping the client develop the house over the coming months, with plans to start on site next spring.

New Roofs and New Relationships At Millgate School, Leicester

Earlier this year, Thinking Buildings were appointed to support Millgate School with a series of improvement projects. The most significant of these is a re-roofing scheme, prompted by the existing roof falling into disrepair. The works will see a full replacement with a new clay tile roof, designed with traditional detailing to respect the building’s character, alongside a new flat roof to modern standards.

We’ve been appointed to deliver architectural design, building regulations principal designer (PD) duties and Construction (Design and Management) (CDM) principal designer services. Alongside the main works, we also provided support in our CDM PD capacity for the safe removal of asbestos and the installation of new air source heat pumps, helping to future-proof the school’s energy use.

This project also marks the start of a new working relationship with Addison Hunt, who are providing project management and quantity surveying services. We’ve also been pleased to work with new clients Discovery Trust, and hope this is the first of many opportunities to support them in improving and developing their schools.

Thinking Buildings Shortlisted for Award!

We are delighted to announce that we have been shortlisted for ‘Best Architect or Designer for an Extension Project.’

Our Associate, Bethan, was the lead designer on our Stowbridge House project set within the Cotswold National Landscape. Our client wished for an extension to the existing property that provided an open, contemporary, living space to complement the more enclosed traditional spaces. Part of the contemporary feel of the design derives from the use of zinc in the extension. It gives a wonderful sleek and modern aesthetic with minimal, to no, maintenance needs.

Our clients told us, ‘we are extremely pleased with the design and quality of the construction. We had a really good team’

We are keeping our fingers crossed that we might be able to dress up for an awards evening soon…..

Low Energy House, Oxfordshire

This new low energy house in Oxfordshire has been submitted for planning – combining traditional shapes and building form with a sharp modern palette of materials. Whilst the project is part of a downsizing exercise for our client as they look forward towards retirement, the brief was to create large and generous living spaces that have a strong connection with outside and the lovely rural setting. The design is composed of two main elements, with the main 1.5 storey core providing the key living spaces and double height entrance hall, and a grass roofed, zinc clad single storey element providing additional accommodation without increasing first floor massing.

The client is keen to adopt super low Passivhaus principles to create a home with minimal energy needs and high levels of occupant comfort – a really important factor in homes designed for retirement.

The project was carefully developed with Matthew Chadwick of The John Phillips Planning Consultancy Ltd. (JPPC)